Rail replacement buses 2 - 13 January 2019

In January 2019, PTV are undertaking a major Summer Construction Blitz which will affect public transport and road users. Construction will be during the historically quietest traffic period, 2 January to 13 January.

During this period the 601 bus will travel between the Clayton Bus loop and Caulfield stopping out the front of building H.

Please visit these links to see if your commute will be affected

PTV - https://www.ptv.vic.gov.au/news-and-events/news/construction-blitz-across-roads-and-public-transport-2/

Metro trains

Pakenham/Cranbourne: http://www.metrotrains.com.au/planned-work/buses-replace-trains-between-flinders-street-and-westall-2-to-13-january/

Frankston: http://www.metrotrains.com.au/planned-work/buses-replace-trains-between-flinders-street-and-moorabbin-frankston-and-stony-point-2-to-13-january/